You an use one of the following options below to schedule the running of an Activate Connector:
Option 1: Scheduled job (Preferred)
- Create task that runs the connector workflows.
- Set actions on scheduler to run the task.
- Errors will be logged to this job
- Ensure email on catch and at end of workflow that sends an email to a mailbox that is monitored if any errors have occurred in the job
Pros:
- Errors will be logged to the job
Cons:
- Harder to setup.
- Can cause noise in the job list.
Option 2: Scheduled workflow
- Set actions on Scheduler to point at FullWorkflow parameters on connector.
- Schedule to run at a specific time each day.
- Ensure ErrorNotificationTo and ErrorNotificationMessage on Resources > Schedulers are set and point to a user or role with mailboxes.
- Test that errors turn up in this mailbox
Pros:
- Simple to set up
Cons:
- No job to log errors to