Updating Activate
4 min
This guide outlines the steps required to successfully upgrade the Activate platform, including preparatory actions, upgrade execution, and post-upgrade validation.
1. Planning the Upgrade
Before initiating the upgrade, ensure that all required software and platform versions are compatible. Refer to Server Requirements to ensure requirements are still met.
Recommended Preparatory Steps
To ensure you have a rollback option in case of issues:
- Back up the Activate Database
- Create a snapshot of the Activate Server that is being upgraded
2. Performing the Upgrade
Pre-Upgrade Checklist
Before starting the upgrade:
- Confirm you are the only user logged into the Activate Server
- Close all instances of Activate Studio on the server
- Perform a full SQL backup of the Activate Database
- Download the latest installer from the Activate Support Portal
Upgrade Process
- Copy the installer to the Activate Server
- Extract the installer ZIP to a temporary location
- Navigate to the ActivateInstaller folder and run ActivateInstaller.exewith elevated (Administrator) privileges
- In the installer:
- Select Activate Server
- Select the current instance to upgrade
- Click Upgrade Instance
- Follow the prompts in the installation wizard to complete the process
Post-Upgrade Steps
After the upgrade is completed:
- Review and resolve any verification errors or prompts
- Check for any System_ parameters that may require attention
- Open the Task List in Activate Studio to review any warnings or required follow-up actions
- Refer to Conflict Merge Guide to understand Activate's Conflict system and how to perform parameter merges.